Friday, February 10, 2012

Development Log: February 10, 2012

Finished remodeling all the walls for the bridge. Added textures for the damage control and environmental control panels.


Friday, September 16, 2011

Development Log: September 16, 2011

Starting a second pass on the bridge module. Walls are curving at a more accurate angle, added the frame around the stations, better model for the screen frames, and wainscot paneling between the wall and floor. Only the security, port turbolift, and communication stations have been updated. You can compare these to the original version of the turbolift and the engineering stations on the ends of the image.


Monday, May 16, 2011

Development Log: May 10-16, 2011

Continued work on main engineering. Modeling the intermix chamber, especially the plasma effect, was a challenge. I'm currently modeling based on The Motion Picture set, since it's simpler and contains the basic structure. I intend to eventually model the Wrath of Khan version with the dilithium chamber room. Last image (May 16) adds control panels and the two transparent lifts.


Monday, May 2, 2011

Development Log: May 2, 2011

I decided to try to model a character. So I modeled the Wrath of Khan era officer's uniform.


Friday, April 29, 2011

Development Log: April 29, 2011

Started work on main engineering. On an interesting note, most technical diagrams place the horizontal intermix chamber on deck 15, two decks above the cargo bay. In order to fit the second floor of engineering inside the model as well as angling the intermix chamber into the warp pylons, I had to move main engineering one deck lower than most diagrams.