Friday, April 29, 2011

Development Log: April 29, 2011

Started work on main engineering. On an interesting note, most technical diagrams place the horizontal intermix chamber on deck 15, two decks above the cargo bay. In order to fit the second floor of engineering inside the model as well as angling the intermix chamber into the warp pylons, I had to move main engineering one deck lower than most diagrams.


No comments:

Post a Comment