Starting a second pass on the bridge module. Walls are curving at a more accurate angle, added the frame around the stations, better model for the screen frames, and wainscot paneling between the wall and floor. Only the security, port turbolift, and communication stations have been updated. You can compare these to the original version of the turbolift and the engineering stations on the ends of the image.
No comments:
Post a Comment