Sunday, February 24, 2013

Development Log: February 22-24, 2013

Completed initial pass on torpedo bay. The torpedo bay length was reduced by about 1/4 to keep the warp core from going though the torpedo bay. There is still enough space behind the back wall to allow a torpedo to slide to the left or right to get around the warp core and into the torpedo launcher. Started second pass on main engineering.


No comments:

Post a Comment